---
title: "Project Boiler room with hot water system – IM Duurzaam"
description: "Boiler room with hot water by IM Duurzaam for a hotel-restaurant. Cascade boilers, 750L hot water capacity, and dynamic heating system balancing renewed within 1.5 weeks."
url: "https://im-duurzaam-upgrade.ubo-dev.nl/en/projects/boiler-room-with-hot-water-system/"
language: "nl"
---

Commercial

Gas Combustion Systems

# Boiler room with hot water system

Share this post

**In short**

- Boiler room for hotel–restaurant
- 5-week turnaround due to January closure
- Dynamic balancing of the complete heating system

![1Y1A2294](https://im-duurzaam-upgrade.ubo-dev.nl/media/uploads/2025/05/1Y1A2294-1-scaled.jpg?width=1500 "1Y1A2294")

## The client’s request;

This installation had been under our maintenance for some time and had reached the end of its technical lifespan.

The client requested a complete system replacement within a limited timeframe, as the hotel-restaurant would be closed for 1.5 weeks in January.

## How we supported the client:

Because we were already familiar with the installation through ongoing maintenance, we had clear insight into the existing issues. Based on this, we developed a structured plan:

- Installation of dynamic radiator valves on all radiators to enable proper hydronic balancing across the hotel and restaurant.
- Conversion of several underfloor heating manifolds to open systems with mixing setups, preparing the installation for a future heat pump
- Installation of multiple boilers in cascade for better load distribution
- Expansion of the domestic hot water system from 600 to 750 liters, including a 90 kW double-separated plate heat exchanger
- 20% increase in heating capacity for the hot water system
- Upgrade of the control system to enable weather-compensated operation
- Installation of a transport pump with smart control

![1Y1A2296 site](https://im-duurzaam-upgrade.ubo-dev.nl/media/uploads/2023/05/1Y1A2296-site-scaled.jpg?width=1500 "1Y1A2296 site")

![1Y1A2306 site](https://im-duurzaam-upgrade.ubo-dev.nl/media/uploads/2023/05/1Y1A2306-site-scaled.jpg?width=1500 "1Y1A2306 site")

![1Y1A2349 site](https://im-duurzaam-upgrade.ubo-dev.nl/media/uploads/2023/05/1Y1A2349-site-scaled.jpg?width=1500 "1Y1A2349 site")

![1Y1A2591(uitgeknipt)](https://im-duurzaam-upgrade.ubo-dev.nl/media/uploads/2025/04/1Y1A2591uitgeknipt-e1748421271239.png?width=800 "1Y1A2591(uitgeknipt)")

Do you have a question or would you like to learn more?

## We are here to help.

[Contact us](https://im-duurzaam-upgrade.ubo-dev.nl/en/contact/)

Andere projecten

## Sustainability that works.

[To overview](https://im-duurzaam-upgrade.ubo-dev.nl/en/projects/)

[![1Y1A3393](https://im-duurzaam-upgrade.ubo-dev.nl/media/uploads/2025/05/1Y1A3393-scaled.jpg?width=1000 "1Y1A3393")Heat PumpResidentialReplacing a boiler with a heat pump](https://im-duurzaam-upgrade.ubo-dev.nl/en/projects/replacing-a-boiler-with-a-heat-pump/)[![1Y1A2118 voor site](https://im-duurzaam-upgrade.ubo-dev.nl/media/uploads/2025/04/1Y1A2118-voor-site-scaled.jpg?width=1000 "1Y1A2118 voor site")Air HandlingCommercialOffice building air handling system](https://im-duurzaam-upgrade.ubo-dev.nl/en/projects/office-building-air-handling-system/)[![1Y1A3094](https://im-duurzaam-upgrade.ubo-dev.nl/media/uploads/2025/05/1Y1A3094-1-scaled.jpg?width=1000 "1Y1A3094")Battery SolutionsResidentialBattery Storage Project](https://im-duurzaam-upgrade.ubo-dev.nl/en/projects/battery-storage-project/)
